切顶卸压沿空留巷无煤柱开采工作面支护技术研究 被引量:8

Study on support technology of cutting roof pressure relief gob-side entry nor coal column working face
下载PDF
导出
摘要 在工作面回采过程中,工作面两巷不同位置受动压影响范围和强度都不同。工作面开采后,煤层顶板随之开始弯曲、下沉、垮落,且从顶板垮落到趋于稳定需要一定的时间,因此在沿空留巷过程中巷道的不同位置不仅需要加强巷道原有支护强度,同时需要采用临时支护确保巷道的顶板稳定。根据邢台矿沿空留巷巷道围岩的不同受力特点,将沿空留巷巷道划分为3个区,即超前支护区(工作面前方20 m),超后临时支护区(架后0~100 m)和成巷稳定区(架后100 m之后),不同分区根据实际情况采取不同的加强支护措施。 In the process of working face recovery,the scope and intensity of dynamic pressure in the two roadway of the working face were different.After mining,the coal seam roof started to bend,sink and collapse,and it took some time from roof collapse to stabilization,therefore,different locations of the roadway in the process of leaving the roadway not only needed to strengthen the original support of the roadway,but also needed to use temporary support to ensure the stability of the roof of the roadway.According to the different force characteristics of the surrounding rocks of the roadway along the gob-side entry in Xingtai Mine,the roadway was divided into 3 zones,over-front support zone(20 m before the working face),over-back temporary support zone(0~100 m after the frame)and roadway stabilization zone(after 100 m after the frame),and different strengthening support measures were taken in different zones according to the actual situation.
作者 古际亮 Gu Jiliang(Xingtai Mine,Jizhong Energy Corporation Ltd,Xingtai 054000,China)
出处 《煤炭与化工》 CAS 2021年第9期20-21,26,共3页 Coal and Chemical Industry
关键词 沿空留巷 临时支护 工作面回采 gob-side entry temporary support working face recovery
  • 相关文献

参考文献1

二级参考文献9

共引文献343

同被引文献41

引证文献8

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部