5303大采高工作面末采阶段防片帮技术研究 被引量:3

Research on Anti-spalling of Roadway Wall Technology in Final Mining Stage of 5303 Large Mining Height Face
下载PDF
导出
摘要 为解决大采高工作面末采阶段煤壁易片帮的难题,以寺河煤矿5303工作面末采阶段为工程背景,通过分析大采高工作末采阶段的片帮机理,讨论了诱发片帮的影响因素和防治措施,并提出了工作面末采深孔注浆加固技术。根据工作面的地质条件设计了末采阶段深孔注浆加固方案,通过巷道变形监测可知,主撤巷道两帮平均位移为53 mm,保证了大采高工作面安全贯通主撤巷道。 In order to solve the problem of easy fragmentation of the roadway wall at the final mining stage of a large mining height face,based on the engineering background of the final mining stage of the 5303 working face of Sihe Coal Mine,the mechanism of spalling in the final mining stage of the large mining height is discussed,and the influencing factors and prevention measures of the inducing slabs and the deep hole grouting reinforcement technology at the end of the working face are discussed and proposed.According to the geological conditions of the working face,a deep-hole grouting reinforcement plan at the final mining stage was designed.Through the roadway deformation monitoring,it can be seen that the average displacement of the two sides of the main withdrawal roadway is 53 mm,which ensures the safety of the large mining height working face.
作者 史中刚 SHI Zhonggang
出处 《山西焦煤科技》 CAS 2021年第9期46-49,共4页 Shanxi Coking Coal Science & Technology
关键词 大采高工作面 末采阶段 煤壁片帮 深孔注浆加固 Large mining height working face Final mining stage Coal spalling Deep hole grouting reinforce-ment
  • 相关文献

参考文献5

二级参考文献56

共引文献135

同被引文献18

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部