660 MW机组发电机自动并网顺控逻辑设计

660 MW unit generator automatic grid-connected sequence control logic design
原文传递
导出
摘要 为提高火力发电机组自动化程度,简化发电机并网程序,实现一键并网,避免发电机在手动自动准同期并网过程中出现人为误操作、漏判断、少检查等失误。提出660 MW火力发电机组发电机自动并网顺控逻辑设计方案,实现同步发电机安全、可靠、快速地自动并入电网。 In order to realize one-click grid-connected which improves the degree of automation of thermal power generator sets and simplify the generator grid-connected procedures, in the same time, avoid the human error operation, leakage judgment, less inspection when the generator in the manual automatic quasi-simultaneous grid-connected process. The 660 MW thermal generator set generator automatic grid-connected logic scheme is put forward, in order to achieve the generator safe and reliable automatic integration into the grid.
作者 陈建忠 CHEN Jian-zhong
出处 《节能》 2021年第9期13-15,共3页 Energy Conservation
关键词 发电机并网 顺控逻辑 同期装置 generator grid-connected sequence control logic synchronizing device