期刊文献+

北方某热电联产项目扩建方案研析 被引量:1

Research and Analysis on the Expansion Plan of a Cogeneration Project in the North
下载PDF
导出
摘要 北方某热电联产企业,主要为所在市经济开发区供热和提供工业蒸汽,目前随着经济开发区快速发展,拟进入开发区内企业数量和规模也不断扩大,特别是对蒸汽热负荷需求出现了快速增长,因而对电、热的需求用量迅猛增加。热电联产项目的建设可以保证开发区内入驻企业近期发展对集中供工业蒸汽的需要,也可保证近期开发区发展对配套供热的需要,创造良好投资环境,对其经济发展起到促进与保障作用。本文通过预测、分析、计算,最终选出合理的方案。 A cogeneration company in the north mainly supplies heat and industrial steam to the economic development zone of the city where it is located.At present,with the rapid development of the economic development zone,the number and scale of enterprises that intend to enter the development zone are also expanding,especially for steam heat load demand.There has been rapid growth,and therefore the demand for electricity and heat has increased rapidly.The construction of combined heat and power projects can ensure the recent development of the enterprises in the development zone for the need for centralized supply of industrial steam,as well as the need for supporting heat supply in the recent development of the development zone,create a good investment environment,and promote and promote its economic development.This article finally selects a reasonable plan through prediction,analysis,and calculation.
作者 李若函 LI Ruo-han(Heilongjiang Academy of Forestry Design and Research, Harbin 150000, China)
出处 《应用能源技术》 2021年第9期11-14,共4页 Applied Energy Technology
关键词 循环流化床锅炉 背压机组 热负荷 汽平衡 circulating fluidized bed boiler back pressure unit heat load steam balance
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部