上跨运营地铁隧道的明挖基坑结构变形控制措施分析 被引量:2

Analysis on Structural Deformation Control Measures of Open Excavation Foundation Pit above Crossing Metro Tunnels
下载PDF
导出
摘要 介绍了苏州市星港街隧道上跨运营地铁1号线隧道施工概况,从围护结构、加固以及开挖和回筑3个施工阶段采取了控制措施,如利用试验段优化三轴搅拌桩参数、合理基坑划分、限时回筑等,结合全过程监测,提出了有效控制基坑结构变形的综合措施。 The construction of Xinggang Street tunnel through the Metro line 1.In Suzhou city is introduced.Control measures have been taken from three construction stages of enclosure structure,reinforcement,excavation and back filling.Using the parameters of the three-axis mixing pile,the reasonable foundation pit division,combined with the whole process monitoring,the comprehensive measures to effectively control the structural deformation of the foundation pit are proposed in this paper.
作者 李敏 Li Min(Shanghai Tunnel Engineering Co.,Ltd.,Nanjing 210000,China)
出处 《市政技术》 2021年第10期154-158,共5页 Journal of Municipal Technology
关键词 基坑 上跨 三轴搅拌桩 变形 控制措施 foundation pit above crossing triaxial mixing pile deformation control measures
  • 相关文献

参考文献4

二级参考文献13

共引文献10

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部