摘要
由于有轨电车项目沿线用地紧张,牵引降压变电站选址相对困难。以浙江某地有轨电车项目的箱式变电站为例,分析其标准化方案布置、小型化设备选用以及箱式变电站整体要求,以其为后续同类工程的箱式变电站设计与优化提供借鉴。
Due to the land shortage of tram projects along the line,the site selection for traction step-down substation is rela⁃tively difficult.Taking the box type substation of a tram proj⁃ect in Zhejiang Province as an example,the standardized scheme layout,the selection of miniaturized equipment and the overall requirements for box substation are analyzed,so as to provide a reference for the design and optimization of the box type substation in subsequent similar projects.