以嘉兴市有轨电车一期工程示范段施工项目为例,按照路段及路口两个施工区域,分别阐述两个区域施工期间的专项交通组织,包括行人交通、非机动车交通、机动车交通、公共交通等。对有轨电车项目施工期间的专项交通组织开展研究,以期为同类项目的施工工艺、时序优化提供参考,最大程度地降低施工期间带来的交通影响。
Taking the construction of Jiaxing tram Phase I project demonstration section as an example,and according to construction of road section and intersection two areas,the special traffic organization during the construction of the two areas are elaborated respectively,including pedestrian traffic,non-motor vehicle traffic,motor vehicle traffic and public transport,etc.The study of the special traffic organization during the construction period provides reference for the construction technology and sequence optimization of the follow-up tram projects,it will minimize the traffic impact during tram construction.