摘要
近年来,中国海外EPC1项目蓬勃发展,特别是随着“一带一路”的持续推进,项目总数量、总体量和总金额得到了巨大突破。物流是海外工程项目成功开展的物资保障,也是成本控制的关键组成部分,梳理我国企业在海外EPC项目中的费用构成和风险类型,对费用构成中的物流成本进行阐述,提出正确选择国际贸易术语能够降低物流成本,提升物流进度,降低企业风险。
In recent years,China's overseas EPC projects have developed vigorously,especially with the continuous advancement of the“Belt and Road”initiative,huge breakthroughs have been made in the total number,total volume and total amount of projects.Logistics is the material guarantee for the successful development of overseas engineering projects and a key component of cost control.Sort out the cost composition and risk types of Chinese companies in overseas EPC projects,explain the logistics cost in the cost composition,and propose the correct choice of international trade terms It can reduce logistics costs,improve logistics progress,and reduce corporate risks.
作者
高海燕
GAO Hai-yan(Tongda College,Nanjing University of Posts and Telecommunications,Yangzhou,Jiangsu 225127)
出处
《江苏商论》
2021年第11期48-50,共3页
Jiangsu Commercial Forum
基金
南京邮电大学通达学院教学改革研究项目(JG20519017)阶段性研究成果。
关键词
国际贸易术语
海外EPC项目
物流成本
international trade terms
overseas EPC projects
logistics costs