摘要
某项目由于自嵌块加筋挡土墙本身固有的缺陷和施工质量问题,导致出现多台阶自嵌块加筋挡土墙变形失稳现象。通过对该工程实例失稳原因的进行分析,提出“重力式挡土墙+钢筋混凝土面板+预应力锚索+格构梁+注浆”的联合加固技术处理方案。方案实施后,经过一个水文年的监测结果表明加固工程取得预期效果。
Due to the inherent defects and construction quality problems of self inlaid reinforced retaining wall in a project,the multi-step self inlaid reinforced retaining wall is deformed and unstable.Through the analysis of the instability causes of the project example,the combined reinforcement technology scheme of"gravity retaining wall+reinforced concrete panel+prestressed anchor cable+lattice beam+grouting"is put forward.After the implementation of the scheme,the monitoring results of one hydrological year show that the reinforcement project has achieved the expected effect.
作者
易平
YI Ping(China Nerin Engineering Technology Co.,Ltd.,Nanchang,Jiangxi330038,China)
出处
《有色冶金设计与研究》
2021年第5期35-38,共4页
Nonferrous Metals Engineering & Research
关键词
土力学
自嵌块加筋挡土墙
多台阶
重力式挡土墙
预应力锚固
soil mechanics
self embedded reinforced retaining wall
multi step
gravity retaining wall
prestressed anchorage