期刊文献+

山区高速公路匝道桥现浇箱梁支架施工技术 被引量:5

Cast-in-pace Box Girder Support Construction Technique of Ramp Bridge in Mountainous Expressway
下载PDF
导出
摘要 山区地形条件复杂,修建高速公路匝道设计半径小,墩柱高度大,通过玉石高速坪地互通项目匝道桥现浇梁的顺利实施,总结了山区高速匝道桥现浇支架的比选经验,给出现浇支架的设计以及相应的施工流程。 The mountainous terrain conditions are complex.The design radius of constructing the expressway ramp is small.The height of pier column is high.According to the smooth implementation of the cast-in-place girder of ramp bridge in Yushi Expressway Pingdi Interchange Project,the comparison and selection experience of the cast-in-place support of the mountainous expressway ramp bridge is summarized,and the design method and the relevant construction process of cast-in-place support are given.
作者 赵科锋 徐民生 ZHAO Kefeng;XU Minsheng
出处 《城市道桥与防洪》 2021年第10期147-149,M0014,共4页 Urban Roads Bridges & Flood Control
关键词 山区高架 匝道桥 现浇施工 支架 mountainous viaduct ramp bridge cast-in-place construction support
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献17

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部