摘要
山区地形条件复杂,修建高速公路匝道设计半径小,墩柱高度大,通过玉石高速坪地互通项目匝道桥现浇梁的顺利实施,总结了山区高速匝道桥现浇支架的比选经验,给出现浇支架的设计以及相应的施工流程。
The mountainous terrain conditions are complex.The design radius of constructing the expressway ramp is small.The height of pier column is high.According to the smooth implementation of the cast-in-place girder of ramp bridge in Yushi Expressway Pingdi Interchange Project,the comparison and selection experience of the cast-in-place support of the mountainous expressway ramp bridge is summarized,and the design method and the relevant construction process of cast-in-place support are given.
作者
赵科锋
徐民生
ZHAO Kefeng;XU Minsheng
出处
《城市道桥与防洪》
2021年第10期147-149,M0014,共4页
Urban Roads Bridges & Flood Control
关键词
山区高架
匝道桥
现浇施工
支架
mountainous viaduct
ramp bridge
cast-in-place construction
support