摘要
文中主要分析了工程设计中室外埋地消防水池溢流排水管间接排水做法、消火栓系统分区、喷淋末端试水装置安装、消防炮系统供水采用喷淋泵与消防炮泵串联供水等问题。
This paper mainly analyzes the indirect drainage method of the overflow drainage pipe of the outdoor buried fire pool in the engineering design,the zoning of the fire hydrant system,the installation of the water test device at the spray end,and the water supply of the fire monitor system adopts the series water supply of the spray pump and the fire monitor pump.
作者
朱明聪
Zhu Mingcong(Wandi United Engineering Design Co.Ltd.,Xiamen,Fujian 361009)
出处
《江西建材》
2021年第9期94-95,共2页
Jiangxi Building Materials
关键词
间接排水
分区
末端试水
串联供水
Indirect drainage
Zoning
Terminal water test
Water supply in series