期刊文献+

大采高综采面沿空巷道围岩控制技术探讨 被引量:3

Discussion on Disaster Control Technology of Roadway Surrounding Rock in Gob-side entry at Large-mining-height Fully-mechanized Working Face
下载PDF
导出
摘要 文中对A组煤大采高综采工作面沿空巷道矿压综合分析与支护加固技术进行研究,并以安徽张集煤矿1610A综采工作面运顺沿空巷道顶、帮治理工程为背景,针对A组煤大采高工作面沿空巷道顶板压力大及回采动压显现较大的压力叠加现象,采取了针对性的差异化锚索支护方案,并采用超细水泥循环注浆加固煤壁、改良煤体技术,提高煤体强度。通过采取综合支护、加固治理措施,巷道治理取得良好效果。研究结果可以为其他矿井类似条件的综采工作面沿空巷道治理提供一定的借鉴。 Aiming at the large roof pressure in gob-side entry and dynamic stress superposition in mining at 1610A large-mining-height fully-mechanized working face with A group coal of Anhui Zhangji Colliery,the author proposes the corresponding anchor-cable support scheme with reinforcing coal side by circulating grouting with superfine cement,improving coal body and increasing coal body strength,which has been proved effective in roadway control and can provide a reference for similar gob-side entry control.
作者 高敏 Gao Min(Zhangji Colliery,Huaihe Energy Coal Industry Co.,Huainan,Anhui 232000)
出处 《江西煤炭科技》 2021年第4期60-62,共3页 Jiangxi Coal Science & Technology
关键词 沿空巷道 矿压 锚索梁补强支护 煤体注浆加固 二次循环注浆 gob-side entry underground pressure anchor-cable-beam supplement support coal body reinforcement by grouting secondary circulating grouting
  • 相关文献

同被引文献11

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部