期刊文献+

10-201工作面充水因素分析与防治水措施 被引量:1

Analysis of Water filling Factor and Water Control Measures at 10-201 Working Face
下载PDF
导出
摘要 木瓜煤矿10-201工作面充水水源主要为顶板灰岩裂隙水,工作面初采初放期间预计最大涌水量50 m^(3)/h,回采期间正常涌水量为20~30 m^(3)/h。综合采用瞬变电磁探测、无线电波坑道透视、探测钻孔进行了工作面水文地质探测与验证。探测结果显示,10-201工作面回采区域内无其它不良水体及地质异常体,为工作面安全开采提供了依据。 Aiming at the water filling source of roof limestone fissure water at 10-201 working face of Mugua Colliery with the estimated maximum water inflow of 50 m^(3)/h during primary mining and caving,and the normal mining water inflow of 20~30 m^(3)/h during stoping,the paper presents the comprehensive application of TEM detection,radio wave tunnel perspective and drilling in hydrogeological detection and verification,whose results show that there are no unfavorable water body and geologic abnormal body in the mining area of 201 working face,providing a basis for safety mining.
作者 袁远 Yuan Yuan(Geological Survey Dept.Fangshan Mugua Colliery,Liangshan Coal and Electricity Co.,Ltd.,Huozhou Coal and Electricity Group Co.,Fangshan,Shanxi 033000)
出处 《江西煤炭科技》 2021年第4期117-119,共3页 Jiangxi Coal Science & Technology
关键词 充水因素 正常涌水量 物探测试 钻探验证 water filling factor normal water inflow geophysical testing drilling verification
  • 相关文献

参考文献5

二级参考文献29

共引文献51

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部