基于BIM技术的工程建筑项目管理方法 被引量:2

Construction Project Management Method based on BIM Technology
下载PDF
导出
摘要 传统的工程建筑项目管理方法存在管理效率差的问题,为此引进BIM技术,提出一种工程建筑项目管理方法。通过分析工程建筑项目管理模型属性、管理模型需求信息,结合建筑信息模型的应用,构建工程建筑项目管理模型。将BIM模型导入计算机操作系统中,调整模型比例尺,使其处于一种相对直观的检索范围内。描述可视化处理界面信息,使BIM模型呈现一种可视化状态。并选择“前锋线融合BIM模型”法,在模型中插入前锋线,调整工程施工进度,控制总工程进度追赶前锋线,以此校正并输出工程建筑项目管理成果,完成对模型的构建。此外,通过对比实验证明,设计的管理方法能够实现对工程建筑项目中各个结构构件可视化展现,并提升了工程建筑项目管理的效率。 The traditional engineering construction project management method has the problem of poor management efficiency.For this reason,BIM technology is introduced and a construction project management method is proposed.By analyzing the attributes of the engineering construction project management model,the management model demand information,and combining the application of the construction information model,a construction project management model is constructed.Import the BIM model into the computer operating system and adjust the scale of the model to make it within a relatively intuitive search range.Describe the visual processing interface information,so that the BIM model presents a visual state.And choose the“forward line fusion BIM model”method,insert the forward line into the model,adjust the construction progress,control the overall project progress to catch up with the forward line,so as to correct and output the construction project management results,and complete the construction of the model.In addition,through comparative experiments,it is proved that the designed management method can realize the visual display of each structural component in the construction project,and improve the efficiency of construction project management.
作者 赵霞 ZHAO Xia(Sichuan Hongjian Construction Project Management Co.,Ltd.,Chengdu Sichuan610000,China)
出处 《北方建筑》 2021年第5期74-77,共4页 Northern Architecture
关键词 BIM技术 工程建筑 项目管理 BIM technology engineering construction project management
  • 相关文献

参考文献5

二级参考文献18

共引文献20

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部