摘要
针对霍州市紫晟煤业2号“三下”压煤现状,通过现场勘查并结合具体地质开采条件提出了短壁膏体连采连充方案;对短壁膏体短壁膏体连采连充工作面进行了设计,对采充工艺、充填工艺进行了设计;针对充填体进行了变形量监测,得到变形量较小,不会对地表建筑物产生影响。
According to the present situation of 2"three lower"coal pressure in Zisheng coal industry of Huozhou City,through on-site investigation and combined with specific geological mining conditions,the short wall paste continuous mining and continuous filling scheme is proposed;the short wall paste short wall paste continuous mining and continuous filling working face is designed,and the mining and filling technology and filling technology are designed;the deformation of filling body is monitored,and the deformation is small,which will not affect the surface construction Buildings have an impact.
作者
胡智平
HU Zhiping(Huozhou Coal Power Group Zisheng Coal Industry Co.,Ltd,Huozhou031400,China)
出处
《煤矿现代化》
2021年第6期9-11,共3页
Coal Mine Modernization
关键词
“三下”压煤
充填
膏体
变形监测
Three-under overlays coal
filling
paste
deformation monitoring