摘要
浙大超重力项目为国家重点项目,地质复杂,地层上部淤泥地质地层约12~15 m厚,呈灰色、饱和、流塑状态,地基需采用单轴搅拌桩进行加固处理,施工前对行搅拌桩工艺参数进行试验,并对相关的数据及处理效果进行研究,为下一步施工提供可靠的保证。
The super-gravity project of Zhejiang University is a national key project with complicated geology.The silt geological stratum in the upper part of the stratum is about 12~15 m thick and is in the state of gray,saturated and flowing plastic.The foundation should be reinforced by single-axis stirring pile,in order to provide a reliable guarantee for the next step of construction,the technical parameters of the row mixing pile are tested before construction,and the related data and treatment effect are studied.
作者
张亚峰
龙伟义
Zhang Ya-feng;Long Wei-yi
出处
《建筑技术开发》
2021年第20期161-162,共2页
Building Technology Development
关键词
超深
淤泥质地层
水泥土搅拌桩
ultra-deep
muddy stratum
cement-soil mixing pile