摘要
巴塘水电站地处于高山峡谷地区,可利用的施工场地有限,具有截流运输难度大、边界条件复杂、抛投强度高等特点,通过对截流总体规划设计和科学合理的组织管理,成功实现了该水电站截流目标任务。为后续相关水电站建设积累了宝贵经验,可为以后类似工程提供参考。
Batang Hydropower Station is located in high mountain and canyon area with limited construction site,and the closure of river has the characteristics of difficulty in transportation,complicated boundary conditions,and high intensity of throwing and dropping.Through overall planning and design of closure and scientific and reasonable organization and management,the closure target of the hydropower station has been successfully achieved.It has accumulated valuable experience for the subsequent construction of related hydropower stations and can provide reference for similar projects in the future.
作者
廖有林
杜晓凡
陈志刚
LIAO Youlin;DU Xiaofan;CHEN Zhigang(Batang Branch of Huadian Jinsha River Upstream Hydropower Development Co., LTD, Chengdu, Sichuan, 610041)
出处
《四川水力发电》
2021年第5期133-135,140,共4页
Sichuan Hydropower
关键词
巴塘水电站
截流规划
截流措施
截流备料
Batang Hydropower Station
closure planning
closure measures
preparation of materials for closure