摘要
道路桥梁工程建设事关我国交通运输体系的完善,是我国公共基础工程的重要组成部分。道路桥梁工程的施工技术水平伴随着经济发展、技术进步不断提升,但是针对其中的重点部分,依然需要持续优化施工管理和施工技术。从当前我国道路桥梁工程施工的实际情况来看,沉降路段的路基面施工问题仍未得到妥善解决,施工单位务必对此问题予以足够重视。因此,论文对道路桥梁建设中道路桥梁沉降的原因进行分析,研究道路桥梁工程中沉降段路基面施工控制的原则与方案,并围绕道路桥梁工程沉降路段路基面施工技术展开探讨。
The construction of road and bridge engineering is related to the improvement of China's transportation system and an important part of China's public infrastructure engineering.The construction technology level of road and bridge engineering is continuously improved with economic development and technological progress.However,for the key parts,it is still necessary to continuously optimize the construction management and construction technology.Judging from the current actual situation of road and bridge engineering construction in China,the construction problem of the subgrade surface of the settlement section has not been properly resolved,and the construction unit must pay sufficient attention to this problem.Therefore,this paper analyzes the causes of road and bridge settlement in road and bridge construction,studies the principles and scheme of subgrade surface construction control of settlement section in road and bridge engineering,and discusses the subgrade surface construction technology of settlement section in road and bridge engineering.
作者
姚志
YAO Zhi(Jiangsu Road and Bridge Engineering Group Co.,Ltd.,Xuzhou 221000,China)
出处
《中小企业管理与科技》
2021年第33期188-190,共3页
Management & Technology of SME
关键词
道路桥梁工程
沉降路段
路基面施工技术
软土地基
road and bridge engineering
settlement section
subgrade surface construction technology
soft soil foundation