摘要
综合已有研究成果,对高速公路桥梁工程缆索系统各方面的施工工艺优化问题进行了综合性研究,对拼接吊塔、扣塔以及主承重索锚碇、工作索锚碇、扣背索锚的锚固等施工工艺进行了优化。
Based on the research results that have been obtained, a comprehensive study of the construction process optimization problems of various aspects of the cable system of the expressway bridge engineering is carried out, and some new methods for the construction process optimization of the cable system of the expressway bridge engineering are proposed. Optimize the construction technology of splicing suspended towers and buckle towers.
出处
《建筑机械》
2021年第11期45-48,共4页
Construction Machinery
基金
中铁建股份公司科研课题2018-C18。