摘要
本文从实际可执行角度出发,提出由储能系统替代变电站改扩建,从而满足充电桩的电力需求方案,该方案的执行也将从根本上提升充电桩设施大面积提升的可行性。
This paper puts forward a plan to replace the substation with the energy storage system,so as to meet the power demand of the charging pile,the implementation of the program will also fundamentally improve the feasibility of large-scale upgrading of charging pile facilities.
作者
梁建宾
王星
赵中良
李小萌
Liang Jinbin;Wang Xing;Zhao Zhongliang;Li Xiaomeng(Powerchina Henan Electric Power Engineeing Co.,Ltd,Zhengzhou Henan 450000;State Grid Zhengzhou Electric Power Supply Company,Zhengzhou Henan,450000)
出处
《电子测试》
2021年第20期111-112,116,共3页
Electronic Test
关键词
充电桩
储能
变电站
负荷增长
charging piles
energy storage
substations
power load growth