摘要 鉴于地下洞室群围岩稳定性是影响大型水电工程建设成败的重要因素,依托乌东德水电站泄洪洞工作闸室,围绕闸室埋深大、地应力成因复杂、洞室开挖规模大、岩层走向与洞轴线小角度相交等带来的施工期围岩稳定问题,结合工程地质条件、开挖支护措施和施工进度安排等,建立了三维地质概化有限元模型,依据工程地应力实测资料反演获得闸室区域初始地应力场,进而分析了闸室施工期围岩稳定性,并根据分析结果提出了合理化建议。 The stability of surrounding rock of underground caverns is an important factor affecting the success or failure of large scale hydropower projects.Based on the working chamber of the flood discharging tunnel of Wudongde Hydropower Station,this paper establishes a three-dimensional geological generalized finite element model in combination with the engineering geological conditions,excavation support measures and construction schedule.Based on the in-situ stress measured data,the initial in-situ stress field in the working chamber area is inversed.And then the stability of surrounding rock during the construction period of the working chamber is analyzed,and reasonable suggestions are put forward according to the analysis results.
作者 周华 张雨霆 陈东斌 王占军 曹去修 ZHOU Hua;ZHANG Yu-ting;CHEN Dong-bin;WANG Zhan-jun;CAO Qu-xiu(Changjiang Institute of Survey.Planning,Design and Research,Wuhan 430010,China;Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China)
出处 《水电能源科学》 北大核心 2021年第11期140-144,共5页 Water Resources and Power
基金 国家重点研发计划(2017YFC0404906) 长江设计院自主创新项目(CX2020Z47) 中国科协青年人才托举工程。
关键词 乌东德水电站 泄洪洞 工作闸室 围岩稳定性 初始地应力 Wudongde Hydropower Station flood discharging tunnel working chamber stability of surrounding rock initial geostress