武汉恒隆广场二期购物中心及地下室工程地上6层,地下3层,地下室共计3根大截面钢骨柱,均分布在地下室靠近中间区域。以首层内支撑梁为依托制作钢结构滑移式运输吊装平台,成功解决了因钢柱距离基坑边缘较远而无法利用大型起重设备进行吊装的难题,减少了地下室塔式起重机的投入。重点介绍滑移式运输吊装平台、钢柱吊装、内支撑拆除与钢柱吊装协调施工等技术。
PhaseⅡof Wuhan Henglong Square has 6 floors on the ground and 3 floors underground.It has 3 large section steel columns in the basement,and the steel columns are all located in the basement near the middle area.Steel structure sliding lifting platform is made by using the inner supporting beam of the first layer.Then the problem of steel column can not be hoisted with large lifting equipment is solved due to large distance of the column and foundation excavation edge.So the basement tower crane can be cancelled.Main hoisting technologies are introdced such as sliding transport lifting platform,steel column hoisting construction,internal support demolition and steel column hoisting coordination construction technology.
作者
叶建
夏睿
魏恒
谢聪
马志同
YE Jian;XIA Rui;WEI Heng;XIE Cong;MA Zhitong(General Construction Company of CCTEB Co.,Ltd.,Wuhan,Hubei 430064,China)
出处
《施工技术(中英文)》
CAS
2021年第18期61-64,共4页
Construction Technology
关键词
钢结构
吊装
滑移
内支撑
轨道
steel structure
hoists
slippage
inner supports
track