摘要
结合某大型深基坑,针对远期有下穿轨道的特殊情况,应用了直径1000 mm SMW工法桩技术,分析了大直径SMW工法桩的受力及变形,并通过实际监测的检验,对其在经济性和技术性上的优缺点进行了论证,对工法受限区域的深基坑支护形式推广有重要意义。
In combination with a large deep foundation pit,the 1000 mm SMW construction method pile technology is applied to the special situation of long-term track underpassing.The stress and deformation of the large-diameter SMW construction method pile are analyzed.The economic and technical advantages and disadvantages are demonstrated,which is of great significance to promotion of deep foundation pit support in areas with restricted construction methods.
作者
高晶
戴源
Gao Jing;Dai Yuan
出处
《建筑技术开发》
2021年第21期135-137,共3页
Building Technology Development
关键词
深基坑
大直径SWM工法桩
远期下穿轨道
变形控制
deep foundation pit
large diameter SWM pile
long term underpass track
deformation control