HL-2M装置集成安装进度控制研究

Research of the assembly and installation schedule control for HL-2M tokamak
下载PDF
导出
摘要 大型托卡马克装置集成安装工程子项多、接口繁多、工作空间狭小、系统复杂、参与人员众多,如何做好装置集成安装的进度控制至关重要。基于工程进度风险管理思维,详细分析了HL-2M装置集成安装进度控制风险因素,并探索了进度控制体系有效运行方式,为安装进度风险可控且实现进度控制目标提供了保障,也为我国大型磁约束核聚变装置集成安装标准化和规模化发展积累了经验。 The assembly and installation work for large tokamak device features lots of sub-projects,many interfaces,small working space,complex systems and many joining personals highlighting the importance of a good control of the overall schedule.Based on the risk management of project schedule,this paper makes a thorough analysis of the risk factors in the assembly and installation schedule control for HL-2M tokamak and explores an effective operating mode for the schedule control system.It is expected that this operating mode can provide guarantee to the controllable schedule risk factors and achievable schedule control objectives,and offer some experiences to standardized and industrialized development for the assembly and installation of China’s large magnetic confinement fusion devices.
作者 李连才 蔡立君 毛维成 杨青巍 李强 王全明 冯勇进 李永革 林晨 张龙 HL-2M研制团队 LI Lian-cai;CAI Li-jun;MAO Wei-cheng;YANG Qing-wei;LI Qiang;WANG Quan-ming;FENG Yong-jin;LI Yong-ge;LIN Chen;ZHANG Long;HL-2M Development Team(Southwestern Institute of Physics,Chengdu 610041)
出处 《核聚变与等离子体物理》 CAS CSCD 北大核心 2021年第S01期300-306,共7页 Nuclear Fusion and Plasma Physics
关键词 HL-2M装置 集成安装 进度计划 进度控制 HL-2M tokamak Assembly and installation Schedule plan Schedule control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部