期刊文献+

HL-2M装置真空系统调试运行 被引量:1

Engineering commissioning of HL-2M vacuum system
下载PDF
导出
摘要 在装置初步建成阶段,有序地开展真空系统的调试内容梳理,制定合理的调试步骤和调试方案,有利于装置各系统的功能确认和故障排除,高效地开展各系统协同运行,为HL-2M装置初始等离子体放电提供装置辅助系统层面的放电条件准备。装置真空系统主要涉及超高真空抽气系统、器壁处理系统和送气加料系统等。基于制定的联调目标,针对HL-2M装置真空相关系统开展了界面关系梳理、子系统调试方案制定、系统工程联调步骤和方案的拟定等工作,通过联调完成了装置在真空获得、壁处理、加料等方面的条件准备,为初始放电提供了基本保障。 In the phase of initial completion of the device,the clarification on the items of engineering commissioning of vacuum and the development of reasonable commissioning scheme are conducive to the functional confirmation,troubleshooting,and the efficient coordinated operation of various systems.And it can prepare discharge conditions for the initial plasma discharge of HL-2M tokamak.The vacuum system of device consists of the ultra-high vacuum pumping system,the wall conditions and the gas injection system.Based on the defined objective,the interface sheets are sorted out,and the commissioning schemes and schedules are formulated for each subsystem and integrated system.The preparation of the vacuum environment,first wall and fueling of the device has been completed,and it provides essential conditions for the first plasma of HL-2M tokamak.
作者 曹诚志 曹曾 冉红 颉延风 蔡潇 季小全 钟武律 杨青巍 毛维成 HL-2M研制团队 CAO Cheng-zhi;CAO Zeng;RAN Hong;XIE Yan-feng;CAI Xiao;JI Xiao-quan;ZHONG Wu-lü;YANG Qing-wei;MAO Wei-cheng;HL-2M Development Team(Southwestern Institute of Physics,Chengdu 610041)
出处 《核聚变与等离子体物理》 CAS CSCD 北大核心 2021年第S01期360-365,共6页 Nuclear Fusion and Plasma Physics
基金 国家重点研发计划(2017YFE0301305,2017YFE0301300)。
关键词 HL-2M装置 真空系统 系统调试 HL-2M tokamak Vacuum system Engineering commissioning
  • 相关文献

参考文献1

二级参考文献1

共引文献22

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部