摘要 基于HL-2M托卡马克初始等离子体放电的工程需求,设计并研制了直流辉光放电清洗系统,包括电极、馈线、电源、控制以及监测等关键部件和辅助子系统。研制完成后开展了系统装配和工程调试,并投入到首次等离子体放电。实验结果表明,该直流辉光放电系统运行稳定、可靠,且此辉光放电清洗显著降低了真空室本底杂质浓度,能满足HL-2M装置初始等离子体放电的壁条件需求。 Based on the engineering requirements of the first plasma discharge of HL-2M,a DC glow discharge cleaning(GDC)system was designed and developed,including electrode,feed through,power supply,control and monitoring etc.components and auxiliary sub-system.In addition,the manufactured components are assembled,the system engineering commissioning has been completed,and it was implemented for the first discharge.The results show that the DC GDC system is stable and reliable,and the GDC cleaning notably reduce the main impurities in vacuum chamber.This system can meet the wall condition requirements of HL-2M first plasma discharge.
作者 曹诚志 曹曾 崔成和 高霄雁 胡毅 黄向玫 周军 李斌斌 HL-2M研制团队 CAO Cheng-zhi;CAO Zeng;CUI Cheng-he;GAO Xiao-yan;HE Yi;HUANG Xiang-mei;ZHOU Jun;LI Bin-bin;HL-2M Development Team(Southwestern Institute of Physics,Chengdu 610041;Department of Engineering and Applied Physics,University of Science and Technology of China,Hefei 230026)
出处 《核聚变与等离子体物理》 CAS CSCD 北大核心 2021年第S01期366-370,共5页 Nuclear Fusion and Plasma Physics
基金 国家重点研发计划资助项目(2017YFE0301305,2017YFE0301300)。
关键词 器壁处理 辉光放电清洗系统 系统工程研制 Wall conditioning Glow discharge cleaning system System engineering development