BIM技术在某地下车库设计施工阶段应用研究 被引量:3

Research on application of BIM technology in design and construction phase of an underground garage
下载PDF
导出
摘要 以连云港民用机场迁建工程地下车库项目为案例,运用BIM技术对地下车库施工图进行审查,创建三维模型,采用多专业碰撞检查优化机电管线综合布置方案,对现场施工应用BIM技术进行可视化技术交底,优化了设计和施工方案、减少了变更,提高了施工质量和施工效率,有利于项目后期的综合运营。 Taking an underground garage project of Lianyungang airport relocation project as an example,This article uses BIM technology to review the construction drawings of the underground garage,creates a three-dimensional model,uses multi-disciplinary collision inspection to optimize the comprehensive layout of electromechanical pipelines,and applies BIM to provide visualization technology confession,optimizes the design and construction plan,reduces changes,improves construction quality and effi ciency.It is conducive to the comprehensive operation of the project in the later stage.
作者 尹步兵 熊纪朋 陈振明 王会 李正超 YIN Bubing;XIONG Jipeng;CHEN Zhenming;WANG Hui;LI Zhengchao(Jiangsu Sugang Engineering Co.,Ltd.,Lianyungang 222100;Lianyungang Technical College,Lianyungang 222000)
出处 《中国建材科技》 CAS 2021年第5期141-142,103,共3页 China Building Materials Science & Technology
基金 2018年江苏省住建厅科技计划项目“基于BIM的高层住宅地下车库深化设计研究”(2018ZD156) 2021年江苏省高校“青蓝工程”资助项目 连云港市第六期“521高层次人才培养工程”。
关键词 BIM技术 地下车库 碰撞检测 管线优化 BIM technology underground garage collision check pipeline optimization
  • 相关文献

参考文献6

二级参考文献44

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 3Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 4Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 5Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 6Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 7Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 8Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.
  • 9刘晴,王建平.基于BIM技术的建设工程生命周期管理研究[J].土木建筑工程信息技术,2010,2(3):40-45. 被引量:98
  • 10李亚东,郎灏川,吴天华.基于BIM实施的工程质量管理[J].施工技术,2013,42(15):20-22. 被引量:74

共引文献681

同被引文献15

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部