大采高工作面覆岩“三带”高度的研究 被引量:3

Research on Height of"Three Zones"of Overlying Strata of Working Face with Large Mining Height
下载PDF
导出
摘要 对晋能控股煤业集团长治三元中能煤业有限公司2301大采高工作面覆岩“三带”高度的研究采用了综合分析的方法,即理论计算、模拟分析和现场实测,得到了2301大采高工作面覆岩“三带”高度。垮落带、裂隙带、弯曲下沉带的高度分别为14.5 m,14.5~51.4 m,51.4 m以上。 This paper researched the height of"three zones"of the overlying strata of 2301 working face with large mining height of Sanyuan Zhongneng Coal Industry Co.,Ltd.of Changzhi of Jinneng Holding Coal Industry Group by adopting a comprehensive analysis method,that is,theoretical calculation,simulation analysis and field measurement,and obtained the height of"three zones"of the overlying strata of 2301 working face with large mining height.The heights of the collapse zone,fracture zone and curved subsidence zone are 14.5 m,14.5-51.4 m and 51.4 m or more respectively.
作者 崔凯 CUI Kai(Sanyuan Zhongneng Coal Industry Co.,Ltd.of Changzhi,Jinneng Holding Coal Industry Group,Changzhi 046000,Shanxi,China)
出处 《能源与节能》 2021年第11期24-27,共4页 Energy and Energy Conservation
关键词 大采高 “三带” 数值模拟 相似模拟 现场实测 large mining height "three zones" numerical simulation similar simulation field measurement
  • 相关文献

参考文献8

二级参考文献75

共引文献216

同被引文献34

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部