Analysis of Abnormal Curtain Grouting
下载PDF
导出
摘要 水井山水库库区为板岩夹碳酸盐岩和灰岩地层,海拔高和断层多,为渗漏通道,灌浆前透水率值小、耗灰量低。选择灌与不灌或怎样灌,经两次试验后,采取提高压力、缩短段长方式继续灌浆。结果表明,决策正确,方法得当,且灌后质量高,达到预期效果。 The reservoir area of Shuijingshan Reservoir is composed of slate,carbonate and limestone strata with high altitude and many faults.It is a seepage passage with low water permeability value and low ash consumption before grouting.After two tests,this paper adopts the method of increasing pressure and shortening section length to continue grouting.The results show that the decision is correct,the method is correct and the quality after grouting is high,achieving the expected results.
作者 秦光斗 杨竣麟 QIN Guang-dou;YANG Jun-lin(Yunnan Water Diversion Project Construction Administration,Kunming 650231,China;Kunming Dongchuan District Water Bureau Management Station,Kunming 654100,China)
出处 《云南水力发电》 2021年第11期149-153,共5页 Yunnan Water Power
关键词 水库库盆渗漏 帷幕灌浆 试验参数 结论分析 reservoir basin leakage curtain grouting test parameter conclusion analysis
  • 相关文献

同被引文献31

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部