摘要
阐述风力发电项目升压站电气设备的安装、调试及管理,升压站电气设备基本情况及安装需求,设备的安装与调试,工程方案的管理。
This paper expounds the installation, commissioning and management of the electrical equipment of the booster station of the wind power project, the basic situation and installation requirements of the electrical equipment of the booster station, the installation and commissioning of the equipment, and the management of the engineering scheme.
作者
史波
SHI Bo(New Energy Branch of Huadian Xinjiang Power Generation Co.,Ltd.,Xinjiang 830063,China)
出处
《集成电路应用》
2021年第10期178-179,共2页
Application of IC
关键词
风力发电
电气设备
升压站
wind power generation
electrical equipment
booster station