期刊文献+

岳城煤矿15号煤大巷注浆加固技术应用 被引量:1

Application of Slurry Reinforcement Technology for No.15 Coal Tunnel in Yuecheng Coal Mine
下载PDF
导出
摘要 针对岳城煤矿15号煤东轨道大巷巷道顶底板变形严重、持续性底鼓等问题,提出了"巷道喷浆+巷帮底板注浆+两帮锚索补强"的综合支护方案,并对注浆工艺进行了系统介绍。现场验证后表明:注浆后巷道顶底移近量最大移进量为169 mm,两帮移近量最大为141 mm,巷道围岩保持了很好的完整性。 In view of the serious deformation of the top and bottom plates of the 15# coal east track roadway in Yuecheng coal mine and the persistent bottom drum, a comprehensive support plan of "roadway slurry spraying +roadway bottom plate grouting + two gang anchor cable reinforcement" is proposed and the grouting process is introduced systematically. After the field verification, it was shown that the maximum amount of top and bottom displacement of the roadway after grouting was 169 mm, and the maximum amount of displacement of the two gangs was 141 mm, and the surrounding rock of the roadway maintained good integrity.
作者 李晋 Li Jin(Yuecheng Coal Mine,Qinxiu Company,Shanxi Jinneng Holding Coal Industry Group,Jincheng Shanxi 048006)
出处 《机械管理开发》 2021年第11期208-210,共3页 Mechanical Management and Development
关键词 底鼓 注浆 围岩控制 bottom drum grouting surrounding rock control
  • 相关文献

参考文献2

二级参考文献15

共引文献453

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部