期刊文献+

某早期燃料后处理厂终态研究

Study on the Final State of an Early Fuel Reprocessing Plant
下载PDF
导出
摘要 退役终态开放形式为有限制开放和无限制开放。除此以外,最终阶段还有一种特殊的做法,就地埋葬即利用该退役核设施良好的工程屏障,将其改造为一个放射性废物处置设施。本文将对某早期后处理厂就地埋葬和全部拆除送处方案的终态进行研究,从方案可行性、政策法规、实施环节等方面进行两个方案的对比,推荐出一种安全、经济、可行的退役终态。 The final open form of decommissioning has restrictions on opening and unlimited opening.There is also a special practice in the final phase of decommissioning that turning the nuclear facility into a radioactive waste disposal facility by utilizing the good engineering barrier.This paper will study the schemes of the final state of an early reprocessing plant's Entombment or all dismantling,and compare the two schemes from the aspects of program feasibility,policy and regulation,implementation link,etc,and propose a safe,economical,feasible final state of the facility of the final state.
作者 沈桢琪 刘迎林 杨美健 鲍芳 Shen Zhenqi;Liu Yinglin;Yang Meijian;Bao Fang(China Nuclear Power Engineering Co.,Ltd.,Beijing 100084,China)
出处 《广东化工》 CAS 2021年第20期201-203,共3页 Guangdong Chemical Industry
关键词 终态 就地埋葬 拆除送处 可行性 政策法规 实施环节 final state entombment dismantling feasibility policies and regulations implementation steps
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部