新孟河延伸拓浚工程首次防洪排涝调度效益分析 被引量:2

Benefit analysis of the first flood control and drainage scheduling in Xinmeng River Extension and Dredging Project
下载PDF
导出
摘要 新孟河工程在防御台风“烟花”期间首次调度运用,行洪历时12 d,外排洪水5500万m^(3),有效提高了流域和区域的防洪排涝能力,减轻了太湖湖西地区以及大运河防洪压力,发挥了巨大防洪排涝效益。在总结新孟河工程调度运用的启用背景的基础上,深入进行了启用效益分析,并研究提出相关优化运用对策与建议。 The Xinmeng River Project was first operated during the defense of typhoon'fireworks'.The flood lasted for 12 days and 55 million m^(3) of flood was discharged,which effectively improved the flood control and drainage capacity of the basin and region,reduced the flood control pressure in the west of Taihu Lake and the Grand Canal,and played a huge flood control and drainage benefit.On the basis of summarizing the background of the operation of the Xinmeng River Project,the benefit analysis of the operation was carried out in depth,and the relevant optimization countermeasures and suggestions were put forward.
作者 鲍建腾 唐仁 刘涛 BAO Jianteng;TANG Ren;LIU Tao(Flood and Drought Disaster Prevention and Control Center of Jiangsu Province,Nanjing 210029,China;Jiangsu Taihu Planning and Design Institute of Water Resources Co.,Ltd.,Suzhou 215106,China;General Irrigation Canal Management Office of Jiangsu Province,Huai'an 223200,China)
出处 《江苏水利》 2021年第11期57-60,共4页 Jiangsu Water Resources
关键词 防洪 台风 调度 新孟河 flood control typhoon scheduling Xinmeng River
  • 相关文献

参考文献4

二级参考文献31

共引文献35

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部