摘要
针对大型排涝泵站石港泵站超工况进行抗旱运行,分析归纳泵站超工况运行产生的危害,通过对机组装置性能的分析计算,开展了管理方法、监测项目、结构优化等技术研究,落实有效的应对措施,总结形成科学的管理对策,在实现抗旱效益的前提下,最大程度做好工程安全运行和技术改进,为今后运行管理提供技术依据。
In view of the drought-resistant operation of Shigang Pumping Station of large-scale drainage pumping station under over-working conditions,the hazards caused by over-working operation of pumping station were analyzed and summarized.Through the analysis and calculation of unit device performance,technical research on management methods,monitoring items and structural optimization was carried out,effective countermeasures were implemented,and scientific management countermeasures were summarized and formed.On the premise of realizing drought-resistant benefits,safe operation and technical improvement of the project were done to the greatest extent,providing important technical basis for future operation and management.
作者
郭军
沈冲
鲜凡凡
张慧峰
GUO Jun;SHEN Chong;XIAN Fanfan;ZHANG Huifeng(The Hongze Lake Water Conservancy Project Management Office of Jiangsu Province,Huai'an 223100,China)
出处
《江苏水利》
2021年第11期61-64,共4页
Jiangsu Water Resources
关键词
石港泵站
超工况
气蚀
监测
结构优化
Shigang Pumping Station
overworking condition
cavitation
monitoring
structure optimization