轿顶子电站引水隧洞富水破碎围岩洞段超前帷幕注浆堵水施工技术研究 被引量:4

Research on Advanced Curtain Grouting Water Plugging Construction Technology in Water-rich Broken Surrounding Rock Tunnel Section of Jiaodingzi Hydropower Station Diversion Tunnel
下载PDF
导出
摘要 超前帷幕注浆堵水是富水围岩地下洞室工程止水加固的重要手段。文章以轿顶子水电站发电引水隧洞富水破碎围岩洞段为例,详细介绍了超前帷幕注浆堵水施工的总体思路和具体流程。施工结果显示,该施工方案的堵水加固效果良好,对相关类似工程具有一定的借鉴意义。 Advanced curtain grouting water plugging is an important means for water sealing and reinforcement of underground cavern in water-rich surrounding rock.The general idea and specific process of advanced curtain grouting water plugging construction are introduced in details in the paper with the water-rich broken surrounding rock tunnel section of the power generation diversion tunnel of Jiaodingzi Hydropower Station as an example.The construction results show that the construction scheme has a good effect of water plugging and reinforcement,which can be used as a reference for related similar projects.
作者 王宏 WANG Hong(Liaoning Zelong Water Industry Co. , Ltd. , Shenyang 110000, China)
出处 《中国水能及电气化》 2021年第11期4-6,59,70,共5页 China Water Power & Electrification
关键词 引水隧洞 超前帷幕注浆 轿顶子水电站 diversion tunnel advanced curtain grouting Jiaodingzi Hydropower Station
  • 相关文献

参考文献8

二级参考文献55

共引文献28

同被引文献37

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部