摘要
电力公司在内外部新形势下,对电力项目可研经济性财务合规性评审提出了新要求,要求投资核减及投向精准。通过总结可研经济性审核国网总体要求,梳理项目历史造价,分析项目特征,通过获取历史造价库、核心指标库、可测算经济效益方法等,提高项目可研论证评审水平,从入口把好项目质量关。
Under the new internal and external situation,power companies propose new requirements for the evaluation of economic feasibility and financial compliance of power project,which requires investment reduction and investment precision.By summarizing the general requirements of the State Grid for economic review of feasibility research,sorting out the historical cost of the project,analyzing the project characteristics,and obtaining the historical cost database,core index database and measurable economic benefit method,the evaluation level of project feasibility research is improved,and the project quality is improved from the start.
作者
解瑾
XIE Jin(State Grid Maintenance Company,SMEPC,Shanghai 200333,China)
出处
《电力与能源》
2021年第5期593-596,604,共5页
Power & Energy
关键词
项目可测算性
财务合规性
投资核减
project measurability
financial compliance
investment reduction