摘要
结合深圳市福田区翠湾社区第一幼儿园项目,介绍了钢结构模块化建筑的体系、运输、吊装、节点连接及安装流程,指出应用钢结构模块化建筑可实现90%以上的部品化率,装修结构一体化;拼装更加方便简单,吊装次数少,现场工作量少,可有效缩短施工现场的工期。
This paper introduces the system,transportation,lifting,joint connection and installation process of the steel structure modular building.Combined with the project of the first kindergarten in Cuiwan community,Futian District,Shenzhen City,it can achieve more than 90%part quality rate and the integration of decoration and structure.The assembling is more convenient and simple,the lifting times are less,the on-site workload is less,which can effectively shorten the construction period on-site.
作者
齐华伟
丁桃
赵浩宇
丁磊
Qi Huawei;Ding Tao;Zhao Haoyu;Ding Lei(China Construction International Engineering Co.,Ltd.,Hefei 230093,China;Shenzhen Hailong Construction Technology Co.,Ltd.,Shenzhen 518110,China;Zhonghai Construction Co.,Ltd.,Hefei 230093,China;Anhui Hailong Construction Industry Co.,Ltd.,Hefei 230601,China)
出处
《山西建筑》
2021年第24期37-39,共3页
Shanxi Architecture
关键词
钢结构模块
模块化建筑
节点连接
steel structure module
modular building
joint connection