摘要 结合某工程濒海软弱地基场地翻车机室,对其地下部分的常规结构设计方案与沉井结构设计方案、以及相应的各种施工方案进行分析比较,并对其技术经济指标进行对比。分析结果表明,对于此类工程地质条件的场地,翻车机室地下部分采用沉井结构设计和施工方案是较为适宜的。 Combined with the rotary dumper room of a coastal soft foundation site,this paper analyzes and compares the conventional structural design scheme of its underground part with the open caisson structural design scheme,as well as various corresponding construction schemes,and compares its technical and economic indexes.The analysis results show that for the site with such engineering geological conditions,the open caisson structure design and construction scheme for the underground part of the car dumper room is more appropriate.
作者 孙巍 蔡建平 韩麟 SUN Wei;CAI Jian-ping;HAN Lin(North West Electric Power Design Institute Co.,Ltd.of CPECC,Xi'an 710075,China)
出处 《电力勘测设计》 2021年第S02期40-44,共5页 Electric Power Survey & Design
关键词 濒海软弱地基场地 翻车机室地下部分 沉井结构设计方案 沉井施工方案 coastal soft foundation site underground part of rotary dumper room design scheme of open caisson structure open caisson construction scheme
  • 相关文献

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部