摘要
在深圳城脉金融中心大厦项目中,轻量化支点顶模集成平台系统系首次投入使用。介绍项目概况及轻量化支点顶模集成平台设计基本情况,详细阐述该平台在使用过程中的关键工序,如安装流程、爬升规划,在核心筒剪力墙混凝土浇筑、核心筒变截面、斜墙施工等环节的应对措施,垂直运输方案,核心筒标准层施工流程。
In the project of Shenzhen Chengmai Financial Center Building, the lightweight pivot top module integrated platform system is put into use for the first time. The general situation of the project and the basic design of the lightweight pivot top module integrated platform is introduced, and the key processes of the platform in the use process is expounded, such as platform installation process, climbing planning, countermeasures in the core tube shear wall concrete pouring, core tube variable section, inclined wall construction and other links, vertical transportation scheme, and core tube standard layer construction process.
作者
曾佳明
佘大涛
罗淙仁
刘飞
韩祥
傅锋环
ZENG Jiaming;SHE Datao;LUO Congren;LIU Fei;HAN Xiang;FU Fenghuan(China Construction Third Bureau Group Co.,Ltd.,Wuhan,Hubei 430064,China)
出处
《施工技术(中英文)》
CAS
2021年第20期79-81,共3页
Construction Technology
关键词
高层建筑
核心筒
模板
集成平台
混凝土
浇筑
施工技术
tall buildings
core tube
formwork
integrated platform
concrete
pouring
construction