摘要
文章以托什干河阿合奇县段防洪工程为实例,依据相关标准规范,结合项目区域实际地形、地貌、防洪设施现状等基本因素,确定工程任务和规模,选取最优工程设计方案,进而完成工程总体布置与施工组织设计,最后,还对该段防洪工程进行了简要经济评价,结果表明,各项指标均符合规范要求,工程在经济上是合理的。
Taking the flood control project of Ahqi county section of Taushgan Darya as an example,according to the relevant standards and specifications,combined with the actual topography,landform,flood control facilities and other basic factors of the project area,this paper determines the project task and scale,selects the optimal project design scheme,and then completes the general layout and construction organization design of the project.Finally,a brief economic evaluation of the flood control project is also made.The results show that all indexes meet the requirements of the specification,and the project is reasonable economically.
作者
何蛟
HE Jiao(Aksuta Heyuan Survey and Design Institute CO.LTD.,Aksu 843000,China)
出处
《河南水利与南水北调》
2021年第9期12-13,37,共3页
Henan Water Resources & South-to-North Water Diversion
关键词
托什干河阿合奇县
防洪工程
设计方案
应用
Taushigan Darya
Ahqi County
flood control works
design scheme
application