高层建筑日趋增多,建筑工地施工时通常配置室外(外挂)施工升降机。使用室外施工升降机时,室外园林绿化、管道等工序无法完全提前插入,且容易受极端天气的影响,导致现场无法连续施工,延误施工进度。此外,升降机附着位置外墙面施工无法一次成型,影响外墙面的质量及观感。
When the number of high-rise buildings is increasing,construction elevators have become an indispensable part of the development of social buildings.When using outdoor construction elevators,outdoor landscaping,pipelines and other procedures cannot be fully inserted in advance,and are easily affected by extreme weather,resulting in impossible continuous construction of onsite procedures and delays on-site construction progress.In addition,the construction of the outer wall where the lift is attached cannot be formed at one time,which affects quality and appearance of the outer wall.