摘要
以某工程为例,对复杂地质条件下垂直度控制困难以及桩长不足等问题进行分析,并以此为基础,对预制管桩施工技术的应用进行介绍,旨在为今后施工奠定基础。
Taking a project as an example,this paper analyzes the problems of difficult verticality control and insufficient pile length under complex geological conditions,and on this basis,introduces the construction technology of prefabricated pipe piles,aiming to lay the foundation for future construction.
作者
张勇
吕兵
谢明朋
蔡迪
常龙
Zhang Yong;Lyu Bing;Xie Ming-peng;Cai Di;Chang Long
出处
《建筑技术开发》
2021年第22期87-89,共3页
Building Technology Development
关键词
施工技术
预制管桩
复杂地质
construction technology
prefabricated pipe piles
complicated geological condition