摘要 为了提高风电机组及其关键部件的使用寿命,文章提出了一种基于塔架载荷灵敏度的风电场有功功率分配方法。以风电机组塔架疲劳载荷最小化为优化目标,跟踪风电场总功率目标为约束条件,基于塔架弯矩疲劳载荷灵敏度建立了有功功率控制优化模型。基于优化模型,应用二次规划算法计算出每台风电机组的功率参考值,通过分析风速波动对塔架载荷的影响,优化分配风电场有功功率。仿真结果表明,该有功功率分配方法能够完成风电场总功率的跟踪,同时降低了风电机组塔架疲劳载荷。 In order to improve the service life of wind turbine and its key components,a wind farm active power distribution method based on tower load sensitivity is proposed.Taking minimizing the fatigue load of wind turbine tower as the optimization objective and tracking the total power target of wind farm as the constraint condition,an active power control optimization model is established based on the fatigue load sensitivity of tower moment.Based on the optimization model,the power reference value of each typhoon generator unit is calculated by quadratic programming algorithm.By analyzing the influence of wind speed fluctuation on tower load,the active power of wind farm is optimized.The simulation results show that the proposed active power distribution method can track the total power of the wind farm and reduce the fatigue load of the wind turbine tower.
作者 魏超 唐梓彭 上官炫烁 Wei Chao;Tang Zipeng;Shangguan Xuanshuo(Institute of New Energy Technology,Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,China)
出处 《可再生能源》 CAS CSCD 北大核心 2021年第12期1623-1628,共6页 Renewable Energy Resources
基金 华电集团科技项目(CHDKJ19-02-208)。
关键词 风电机组 载荷优化 功率分配 风电场 塔架弯矩 wind turbine load optimization power distribution wind farm tower bending moment
  • 相关文献

参考文献2

二级参考文献19

  • 1刘科研,盛万兴,李运华.基于分布式最优潮流算法的跨区输电阻塞管理研究[J].中国电机工程学报,2007,27(19):56-61. 被引量:21
  • 2Michael J D, Euan M D, lvana K, et al. Distribution power flow management utilizing an online optimal power flow technique[J]. IEEE Trans on Power Systems, 2012, 27(2): 790-799.
  • 3Min W, Shengsong L. A trust region interior point algorithm tbr optimal power flow problems[J]. International Journal of Electrical Power& Energy Systems, 2005, 27(4): 293-300.
  • 4Chung T S, Ge S Y. A recursive LP-based approach for optimal capacitor allocation with cost-benefit consideration[J]. Electric Power System Research, 1997, 39(2): 129-136.
  • 5Liu Keyan, Li Yunhua, Sheng Wanxing. The decomposition and computation method tbr distributed optimal power flow based on message passing interface(MPl)[J]. International Journal of Electrical Power & Energy Systems, 2011, 33(5): 1185-1193.
  • 6AIHajri M F, EI-Hawary M E. Optimal distribution generation sizing via last sequential quadratic programming[C]//2(107 Large Engineering Systems Conference on Power Engineering. Quebec: IEEE, 2007: 63-66.
  • 7Nejdawi I M, Clements K A, Davis P W. An efficient interior point method tbr sequential quadratic programming based optimal power flow[J]. IEEE Transactions on Power Systems, 2000, 15(41: 1179-1183.
  • 8蔡广林,张勇军,任震.基于非线性多中心校正内点法的最优潮流算法[J].电工技术学报,2007,22(12):133-139. 被引量:7
  • 9刘杨华,吴政球,涂有庆,黄庆云,罗华伟.分布式发电及其并网技术综述[J].电网技术,2008,32(15):71-76. 被引量:207
  • 10夏成军,崔弘,王强,张尧.考虑静态安全约束的分布式电源准入容量计算[J].电网技术,2009,33(16):96-100. 被引量:58

共引文献10

同被引文献26

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部