期刊文献+

某型50 MW机组喷嘴现场取出工艺研究

On-Site Extraction Process of Nozzles in a 50 MW Steam Turbine
下载PDF
导出
摘要 通过对喷嘴现场取出工艺的摸索及工程实践的检验,得出了全套的喷嘴现场取出工艺。通过合理设计设备的结构、合理制定工艺方案,实现了喷嘴现场取出,实际操作验证了喷嘴现场取出工艺的可靠性。该研究成果能够快速、高效、准确地为现场取出喷嘴服务提供可靠的技术支持与保障。 Based on the study of the on-site extraction process technique of nozzle and the assessment for the engineering practice,the whole on-site process was established.By means of designing the equipment structure and establishing the process scheme reasonably,the nozzle was extracted successfully,and the reliability of on-site extraction process of nozzles was verified.The research result can provide rapid,efficient,accurate technical support and guarantee for the on-site extraction service of nozzle.
作者 杜炳千 魏栋 吴晗 DU Bingqian;WEI Dong;WU Han(Shanghai Electric Power Generation Equipment Co.,Ltd.Turbine Plant,Shanghai 200240,China)
出处 《热力透平》 2021年第4期289-292,共4页 Thermal Turbine
关键词 喷嘴 现场 便携式设备 nozzles on-site portable set
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部