摘要
根据CAP1400屏蔽式主泵参数和安装要求,阐述了CAP1400屏蔽主泵安装小车的设计要点和主泵安装操作流程,为后续项目中主泵拆装设备的设计提供技术参考。
According to the parameters and installation requirements of CAP1400 canned reactor coolant pump,this paper expounds the design points and installation operation process of CAP1400 canned reactor coolant pump installation trolley,which provides technical reference for the design of reactor coolant pump disassembly equipment in subsequent projects.