工业企业实现碳达峰碳中和的思考 被引量:4

Thoughts on realizing carbon peak and carbon neutralization in industrial enterprises
下载PDF
导出
摘要 工业企业具有高能耗、高碳排的特性,而降碳是实现碳达峰碳中和目标的关键一环。基于此,本文通过分析碳达峰碳中和愿景下工业企业面临的挑战,提出了关于推进工业企业实现碳达峰碳中和的建议。现阶段,工业企业应以节能减排为抓手,通过调整能源结构、开展技术创新升级、提高能源管理水平、发展去碳技术、利用碳市场交易、低碳数字化转型等方式,为迎接碳达峰碳中和做好充分准备。 Industrial enterprises have the characteristics of high energy consumption and high carbon emission,and carbon reduction is a key part to achieve the goal of carbon peak and carbon neutralization.Based on this,this article analyzes the challenges faced by industrial enterprises under the vision of“carbon peak and carbon neutralization”,and puts forward suggestions for promoting industrial enterprises to achieve carbon peak and carbon neutralization.At this stage,industrial enterprises should focus on energy conservation and emission reduction,and make full preparations for carbon neutralization.The goal is achieved by adjusting energy structure,carrying out technological innovation and upgrading,improving energy management level,developing decarbonization technology,using carbon market transactions,and low-carbon digital transformation.
作者 林育锦 王宇佳 Lin Yujin;Wang Yujia(China Shipping Environmental Technology(Shanghai)Co.,Ltd.,Shanghai 200135,China)
出处 《皮革制作与环保科技》 2021年第21期164-165,168,共3页 Leather Manufacture and Environmental Technology
关键词 碳达峰 碳中和 减碳 carbon peak carbon neutralization carbon reduction
  • 相关文献

参考文献5

二级参考文献15

  • 1国家能源科技“十二五”规划[EB/OL].http://www.gov.cn/gzdt/2012-02/10/content2063324.htm,2013-01-15.
  • 2“十二五”国家战略性新兴产业发展规划[EB/OL].http://www.gov.cn/zwgk/2012-07/20/ontent_2187770.htm.2013-01-15.
  • 3节能减排“十二五”规划[EB/OL].http://www.gov.en/zwgk/2012-08/21/content-2207867.htm,2013-01-15.
  • 4ISO 14064-1-2006,Greenhousegases-Part 1: Specification with guidance at the organization level for quantification and reporting of greenhouse gas emissions and removals [S].
  • 5ISO 14064-2-2006, Greenhouse gases - Part 2 :Speeification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emissionreductions or removal enhancements[S].
  • 6ISO 14064-3-2006,Greenhouse gases- Part 3:Specification with guidance for the validation and verification of greenhouse gas assertions[S].
  • 7中国应对气候变化的政策与行动(2011)[EB/OL].ttp://www.gov.cn/jrzg/2011-11/22/content_2000047.htm,2013-01-15.
  • 8张建平,范喆,王阳利,黄志刚.基于4D-BIM的施工资源动态管理与成本实时监控[J].施工技术(下半月),2011,40(2):37-40. 被引量:150
  • 9赵彬,王友群,牛博生.基于BIM的4D虚拟建造技术在工程项目进度管理中的应用[J].建筑经济,2011,32(9):93-95. 被引量:123
  • 10张建平,李丁,林佳瑞,颜钢文.BIM在工程施工中的应用[J].施工技术(下半月),2012,41(8):10-17. 被引量:632

共引文献131

同被引文献24

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部