预制装配式建筑是近年来工程建设领域出现的一种新型施工模式,由于其施工效率高、机械化程度高等优势,开始被广泛应用于多种工程施工当中。在地铁车站建设方面,虽然采用预制装配式施工历史较短,但近年来随着相关技术、设备的发展进步,目前,预制装配式施工在地铁车站建设中的应用已较为成熟,且取得了良好效果。论文结合深圳市地铁12号线车站施工项目,分析了预制装配式地铁车站施工的重难点,并提出了具体的应对措施。
Prefabricated building is a new construction mode in the field of engineering construction in recent years. Because of its advantages of high construction efficiency and high degree of mechanization, it has been widely used in a variety of engineering construction. In terms of subway station construction, although the prefabricated construction has a short history, in recent years, with the development and progress of relevant technologies and equipment, the application of prefabricated construction in subway station construction has been relatively mature and achieved good results. Combined with the station construction project of Metro Line 12 in Shenzhen City, this paper analyzes the key and difficult points in the construction of prefabricated metro station, and puts forward specific countermeasures.
作者
曹仲良
CAO Zhong-liang(PowerChina Construction Southern Construction Investment Co.Ltd.,Shenzhen 518000,China)
出处
《工程建设与设计》
2021年第22期123-125,146,共4页
Construction & Design for Engineering
关键词
施工难点
预制装配式
应对措施
地铁车站
construction difficulties
prefabricated
countermeasures
subway station