期刊文献+

桥梁冲击成孔灌注桩施工中的溶洞处理方法探究——以海月桥项目为例 被引量:2

Study on Treatment Method of Karst Cave in the Construction of Percussive Bored Pile of Bridge——Taking Haiyue Bridge Project as an Example
下载PDF
导出
摘要 以海宁市海月桥工程项目为例,介绍了桥梁冲击成孔灌注桩施工过程中溶洞的处理方法,对常规的冲击成孔灌注桩工艺的不足之处进行了分析,提出了一种回填黏土、块石的溶洞处理方法,以全面保证溶洞区域桥梁桩基的施工质量,以供参考。 Taking Haiyue Bridge project in Haining City as an example, this paper introduces the treatment method of karst cave in the construction process of bridge impact hole filling pile, and analyzes the shortcomings of the conventional impact hole filling pile technology, and puts forward a treatment method of backfilling clay and block stone into karst cave, so as to guarantee the construction quality of bridge pile foundation in karst cave area, for reference.
作者 孙国培 SUN Guo-pei(Haining Urban and Rural Construction Management Service Center,Haining 314400,China)
出处 《工程建设与设计》 2021年第22期182-185,共4页 Construction & Design for Engineering
关键词 桥梁 冲击成孔灌注桩 溶洞处理 bridge impact bored pile karst cave treatment
  • 相关文献

参考文献3

二级参考文献10

共引文献13

同被引文献12

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部