摘要
汽轮发电机的调试是确保发电机正常运行的前提,文章以印尼某化工项目余热汽轮发电机现场电气安装调试为例,着重阐述了汽轮发电机安装调试主要内容和重点,并就汽轮发电机的电气安装调试进行深入分析探讨。
The commissioning of steam turbine generator is the premise of ensuring the normal operation of the generator.Taking the field electrical installation and commissioning of residual heat steam turbine generator in a chemical project in Indonesia as an example,it expounds the main contents and focus of steam turbine generator,and discusses the electrical installation and commissioning of steam turbine generator.