摘要
该文以横江大道(西江互通连接线城南河路至S356段)工程为实例,通过对其施工特点进行分析可知,该项目具有混凝土用量大的特点,而周边没有符合要求的大型商品混凝土拌合站,为了满足该项目的混凝土需求,使施工更加便捷,决定设置混凝土拌合站,数量为3个,在此基础上,分析了拌合站选址和场地布置等内容,旨在为公路工程施工提供便利。
This paper takes Hengjiang Avenue(section from chengnanhe road to S356,the connecting line of Xiji‐ang Interchange)as an example.Through the analysis of its construction characteristics,it can be seen that the proj‐ect has the characteristics of large concrete consumption,and there is no large commercial concrete mixing station around.In order to meet the concrete demand of the project and make the construction more convenient,it is de‐cided to set up a concrete mixing station,the number is 3.On this basis,the site selection and site layout of the mixing plant are analyzed in order to facilitate the construction of highway engineering.
作者
司鸭群
SI Yaqun(Nanjing Branch of CCCC Third Harbor Engineering Co.,Ltd.,Nanjing,Jiangsu Province,210000 China)
出处
《科技资讯》
2021年第29期52-54,共3页
Science & Technology Information
关键词
拌合站布局
拌合站选址
混凝土
选址
Mixing plant layout
Site selection of mixing plant
Concrete
Site selection